GROWN-UP

20 de dic. de 2021 · 6m 35s
GROWN-UP
Descripción

One day on site…. Definitely the day the rock fell and the two tunnels were joined up. It was the day when 28-year-old engineer Francesco Grasso Leanza witnessed his first...

mostra más
One day on site…. Definitely the day the rock fell and the two tunnels were joined up. It was the day when 28-year-old engineer Francesco Grasso Leanza witnessed his first breakthrough of the bypass on the 28th of June 2021. We are hundreds of metres below ground on the sites of the Third Giovi Pass – Genoa Node, the high-speed railway that will connect Genoa with Milan, constructed by the Cociv Consortium led by the Webuild Group. 
Francesco was very young when he “landed” in Webuild after gaining a Master’s degree at Milan Polytechnic and going on to work first on the construction of Genoa's Ponte San Giorgio and now the Third Pass. He left his native Sicily at 16 years of age to attend military college in Venice, then university in Milan. He’s been working on the construction sites for two years now, living in base camps with other Webuild engineers, technicians and workers, and he has no doubt about what he'll do when he's grown-up
mostra menos
Información
Autor Webuild Group
Organización Webuild Group
Página web -
Etiquetas
-

Parece que no tienes ningún episodio activo

Echa un ojo al catálogo de Spreaker para descubrir nuevos contenidos.

Actual

Portada del podcast

Parece que no tienes ningún episodio en cola

Echa un ojo al catálogo de Spreaker para descubrir nuevos contenidos.

Siguiente

Portada del episodio Portada del episodio

Cuánto silencio hay aquí...

¡Es hora de descubrir nuevos episodios!

Descubre
Tu librería
Busca