Why Your Critical Path Changes When Production Changes

14 de sep. de 2026 · 1h 51m 16s
Why Your Critical Path Changes When Production Changes
Descripción

A planned completion date looks reasonable until one operation runs late, a material release slips or a resource disappears, and every downstream promise moves with it. This episode shows manufacturing...

mostra más
A planned completion date looks reasonable until one operation runs late, a material release slips or a resource disappears, and every downstream promise moves with it. This episode shows manufacturing planners and IT/OT architects how to apply critical path thinking to live production, from shared machines and quality holds to MES, ERP, Microsoft Fabric and knowledge graphs, so they can see which dependency controls delivery now.

In this episode
  • 00:00 – Introduction: when the plan meets production
  • 05:20 – One late operation and the delivery date
  • 11:16 – What critical path means on the shop floor
  • 22:43 – Material, shared machines, people and readiness
  • 51:41 – Quality holds and engineering changes
  • 68:15 – Why dashboards don't solve dependency problems
  • 85:27 – Data model, digital twin and knowledge graph
  • 96:07 – Prediction, scheduling, optimization and trade-offs

Key takeaways
  • In production the critical path is the chain of remaining dependencies that controls the earliest completion date right now, and it moves when machines, material, people or quality conditions change.
  • A routing, a status dashboard or a Power BI report shows intent and symptoms, but a live dependency model with explicit links between orders, operations, resources and release conditions is needed to explain why a date moved.
  • Prediction, scheduling and optimization answer different questions, and generative AI should explain schedule results rather than invent the schedule itself.

Worth quoting

“An operation can report late and still not threaten the due date if there's time later in the route.” – Mirko Peters (09:44)

“The route tells you where the part should go, it doesn't tell you when the part can actually go there.” – Mirko Peters (19:21)

Explore more on M365.FM

Follow and rate M365.FM in your podcast app, and join the free M365 community at m365con.net.

Become a supporter of this podcast: https://www.spreaker.com/podcast/m365-fm-microsoft-365-azure-cloud-power-platform-ai--6704921/support.
mostra menos
Información
Autor Mirko Peters M365, Azure & AI
Organización m365 FM
Página web www.m365.fm
Etiquetas

Parece que no tienes ningún episodio activo

Echa un ojo al catálogo de Spreaker para descubrir nuevos contenidos.

Actual

Portada del podcast

Parece que no tienes ningún episodio en cola

Echa un ojo al catálogo de Spreaker para descubrir nuevos contenidos.

Siguiente

Portada del episodio Portada del episodio

Cuánto silencio hay aquí...

¡Es hora de descubrir nuevos episodios!

Descubre
Tu librería
Busca